Bursa · 2025
Project Detail
Automotive Plant — Bursa
An integrated air conditioning project solving comfort and process ventilation together in a high-ceilinged assembly hall.
6 × AHU air handling units (180,000 m³/h total)
Fresh air system with heat recovery
Paint booth exhaust and supply lines
BMS automation and remote monitoring
Details
Project Details
| Sector | Automotive |
|---|---|
| Total Flow | 180,000 m³/h |
| Duration | 5 months |
| Scope | Design + manufacturing + installation |
Project Summary
Unit capacities were determined by analysing the thermal load and process requirement of the production hall. Energy consumption was minimised with heat recovery units.