Automotive Plant — Bursa
Bursa · 2025
Automotive Plant — Bursa 1 Automotive Plant — Bursa 2 Automotive Plant — Bursa 3
Project Detail

Automotive Plant — Bursa

An integrated air conditioning project solving comfort and process ventilation together in a high-ceilinged assembly hall.

6 × AHU air handling units (180,000 m³/h total)
Fresh air system with heat recovery
Paint booth exhaust and supply lines
BMS automation and remote monitoring
Details

Project Details

Sector Automotive
Total Flow 180,000 m³/h
Duration 5 months
Scope Design + manufacturing + installation

Project Summary

Unit capacities were determined by analysing the thermal load and process requirement of the production hall. Energy consumption was minimised with heat recovery units.