Logistics Centre — Kocaeli
Kocaeli · 2024
Logistics Centre — Kocaeli 1 Logistics Centre — Kocaeli 2 Logistics Centre — Kocaeli 3
Project Detail

Logistics Centre — Kocaeli

A rooftop solution with free cooling that conditions a large storage volume at low operating cost.

Free-cooling rooftop units
VRF integration for office blocks
Automation and scheduling
Duct and diffuser distribution
Details

Project Details

Sector Logistics
Capacity 6 × rooftop packages
Duration 3 months
Scope Manufacturing + installation

Project Summary

Thanks to free cooling, cooling is delivered without running the compressors in suitable seasons, reducing energy consumption.