Kocaeli · 2024
Project Detail
Logistics Centre — Kocaeli
A rooftop solution with free cooling that conditions a large storage volume at low operating cost.
Free-cooling rooftop units
VRF integration for office blocks
Automation and scheduling
Duct and diffuser distribution
Details
Project Details
| Sector | Logistics |
|---|---|
| Capacity | 6 × rooftop packages |
| Duration | 3 months |
| Scope | Manufacturing + installation |
Project Summary
Thanks to free cooling, cooling is delivered without running the compressors in suitable seasons, reducing energy consumption.