Ankara · 2025
Project Detail
Pharmaceutical Plant — Ankara
Classified cleanroom and air conditioning infrastructure meeting GMP requirements for pharmaceutical production.
ISO 7 / ISO 8 cleanroom areas
Hygienic (VDI 6022) AHU units
HEPA H14 terminal filtration
Differential pressure automation
Validation and documentation
Details
Project Details
| Sector | Pharmaceutical |
|---|---|
| Class | ISO 7 – ISO 8 |
| Duration | 7 months |
| Scope | Turnkey + validation |
Project Summary
Pressure cascades and air change rates were configured to GMP criteria; the system was handed over with validation reports after commissioning.