Power Plant — İzmir
High-capacity water cooling infrastructure that safely rejects the plant’s process heat to the atmosphere.
Closed circuit cooling towers
Pump station
Water treatment
Automation and monitoring
Details
Project Details
| Sector | Energy |
|---|---|
| Capacity | 2,400 kW |
| Duration | 6 months |
| Scope | Design + manufacturing + installation |
Project Summary
Materials were selected with legionella and corrosion risks in mind; water treatment secures both the service life and the efficiency of the towers.