Our new line, increasing AHU and rooftop production capacity by 40%, has started operating at our Ankara facility.
With the new line commissioned at our production facility in İvedik OIZ, Ankara, we have increased our air handling unit and rooftop production capacity by 40%.
What Changes?
The added capacity means shorter delivery times and more flexible production on projects. Our hygienic unit production has accelerated with the new CNC panel manufacturing cell.
The investment also strengthened our quality control processes; every unit passes a performance test before dispatch.